Data from the 1 248 day period starting on June 25, 2021, indicates 1 analyses of the operation of gopalganj.gov.bd. By successfully returning a status code 200 on June 25, 2021, gopalganj.gov.bd has shown functionality 1 times from total the checks attempted. No occurrences of gopalganj.gov.bd being down were detected during the inspections conducted as of November 24, 2024. It has been noted that as of November 24, 2024, there were no errors in any of the responses received. June 25, 2021, response time of 1.495 seconds was in contrast to gopalganj.gov.bd's average of 1.495 seconds.